Results Attained
  • Loud cheering
  • Out-of-the box thinking
  • Incredible, unifying experience
Great For
  • Mission-vision creation
  • Start of a new year
  • Company meetings
Number of Participants
60 – 200
Program Length
2 ½ – 3 hours
Space Required
Indoors or Outdoors; large conference room; bridge can be 40 – 120 feet long
team, Simulations, teams, learning, work, Building, Team Building, Building Simulations
team, Simulations, teams, learning, work team, Simulations, teams, learning, work
We enjoyed it very much. Building a bridge really symbolized everything we were trying to accomplish over the 2-days of our conference.        Unilever
team
Bridge Building
Here’s the challenge: Build a bridge (using only the materials provided) that will be able to sustain the weight of a golf cart driven across it!! Your materials include cardboard, a tape measure, a knife, and of course, duct tape! Sound impossible? Most teams believe it is when they start the activity, but it can be done!

The bridge will be at least 15” tall and 50” wide. The length of the bridge will vary depending on how many sub-teams are working. We have seen them as long as 120’!

This event creates a truly exciting experience for all involved and the celebration that follows, as the golf cart drives across the bridge, is unbelievable! It presents teams with a next-to-impossible challenge that will leave them with a “you won’t believe what we did” story that will last for a long time. The final team photo of the entire group standing with the bridge is priceless!
Print
web database developmet solution